Rooftop cooling plant with rows of dry coolers and maintenance walkways

From the rack to the hall.

AI systems, colocation and dedicated GPU capacity, planned together around your project.

Three offers. One system.

Take systems, space or capacity on their own, or combine them. Each is planned with the rest of the physical system in view.

Eight-GPU NVIDIA HGX B300 carrier from an ASUS XA NB3I-E12 server, with its eight heatsinks

AI servers and systems

NVIDIA AI servers and rack-scale systems for a new environment or an expanding fleet. We define the platform, configuration and quantity with you; the quotation sets out the proposed supply scope.

  • Eight-GPU servers to full NVL72 racks
  • Current and upcoming NVIDIA generations
Explore AI systems
Data hall with rows of equipment cabinets and overhead power and liquid-cooling connections

High-density colocation

Rack capacity, dedicated suites and halls for liquid-cooled AI infrastructure. Explore custom buildout and joint-venture opportunities in Malaysia and Southeast Asia.

  • Malaysia and Southeast Asia
  • Selected racks, suites and halls in the United States
Explore colocation
Dense fibre and optical interconnect cabling across AI networking equipment

Dedicated GPU capacity

Dedicated GPU servers and clusters matched to your workload. Reserved capacity is available only through long-term contracts.

  • Dedicated servers or full clusters
  • Platform, location and term set per project
Explore GPU capacity

Every part connected.

Compute shapes the facility around it, and the facility, network, power and cooling shape the compute decision in return. We consider them together from the outset.

  1. Dell PowerEdge XE9712 GB300 compute tray seen from above, with copper cold plates and liquid-cooling lines

    Compute

    GPU servers and rack-scale systems, chosen for the workload and the generation you want to run.

    • Platform and configuration
    • Quantity and delivery timing
  2. NVIDIA Quantum-X800 InfiniBand XDR switch, front view

    Network and storage

    The fabric that turns systems into a cluster, and the data paths that keep it fed.

    • Scale-up and scale-out fabric
    • Storage and connectivity
  3. Rooftop cooling plant with rows of dry coolers and maintenance walkways

    Power and cooling

    High-density racks move the constraint to power delivery and heat rejection, often liquid to the chip.

    • Power per rack and redundancy
    • Liquid cooling and heat rejection
  4. Data hall with rows of equipment cabinets and overhead power and liquid-cooling connections

    Facility and capacity

    Racks, a dedicated suite or a hall, in the right location, with room to grow.

    • Location and footprint
    • Term and expansion

Bring the whole project.

Systems and colocation, a dedicated cluster or a wider development: tell us what the project needs, and we will scope it with you.